Blue Lake Wastewater Treatment Plant

  • Industrial
  • Shakopee, MN
  • 66,200 SF
Location
Shakopee, MN
Size
66,200 SF
Client
Metropolitan Council
Design Partner
Black & Veatch

Overview

This facility is comprised of four 1.6 million gallon digester tanks, a two-story 21,000-sf Digester Control Building, 500 ft of service tunnels and 5,300-sf chemical handling building tank modifications to thickening and dewatering building. Installation of pumps in the thickening and dewatering building and final stabilization building. AP installed the electrical systems and controls for all process systems that support the facility which includes pumps, heat exchangers and gas handling equipment and the HVAC.